BRIDGE UR_C / BRIDGE UT_C – FORMWORKS
Send a free RFQ and get the supplier's best price.
Trade with confidence on Abraa
Safe and secure payments using Abraa safe trade systems
Supplier verification not completed
Pay only through Abraa to stay protected. Never pay a supplier by direct transfer.
Secure Payment
Pay through Abraa, never by direct transfer to a supplier.
Product Inspection
Book a check before shipping to confirm quality and quantity.
Buyer Protection
Get support and refunds if goods arrive not as described.
Verified Suppliers
Licence, address and on-site checks by the Abraa team.
Product Specification
| Brand | ARCO |
| Condition | New |
| Warranty | YES |
Product Descriptions
Complete formwork, easy to mount and install. It allows great reduction of transport volumes. Such formworks must be positioned on a suitably high reinforced concrete bed, until it reaches the dock pod level as planned, normally at about 1000 mm.
They can also be connected to each other, to have a whole dock pods front.
They are tailor-made, in order to lodge dock levellers of all dimensions as specified by clients.
Features:
- Front: metal tubing, equipped with steel support to insert dock buffers.
- Rear: metal sheet panel, 15/10 thick, complete of the beam where the dock leveller plate is to be hinged. Hot dip zinc galvanised metal sheet formwork panels, with perforated angle bars reinforcements to increase and guarantee adhesion to concrete.
- The panels can be used also as hooking elements to connect a series of adjoining formworks.
\